Completed projects

Atyrau / November 2023

Installation of an anchor-angle steel pole on a power transmission line

The support structure was made of high-quality steel and equipped with three crossarms used to secure the electrical conductors.

We also installed lightning protection cables that safeguard the conductors from atmospheric impacts.

Atyrau, October 2023

Power supply for the residential district

Six 110 kV cables were installed with a total length of 4,500 meters. The route included crossings beneath several roads and a pipeline.

As part of the project, various construction and installation works were carried out, including soil excavation of different categories and pit cleaning with the formation of neat slopes.

Atyrau, February 2023

Cable line installation for the Talan residential complex by BI Group

A 10 kV cable line was installed to provide power supply to the residential complex. The total length of the line was 440 meters.

Engineering networks for the Jaily Mektep project

Construction and connection of water supply, sewage, heating, and power systems were completed for three schools, ensuring reliable operation and creating proper conditions for educational activities.

Construction of a 35 kV overhead transmission line: pole installation in steppe conditions

Twenty-two anchor towers, each 45–50 meters high, were installed to stabilize the power transmission line. The project enhanced the reliability and resilience of the region’s energy infrastructure.

Modernization of electrical networks in a residential area

Flux implemented a comprehensive project for the modernization and reconstruction of electrical networks in the Nursaya residential district. As part of the project, 66 km of ACB cables were replaced with modern self-supporting insulated wires (SIW), significantly improving the reliability and safety of power supply.

In addition, a new distribution point was built, and a modular enclosed switchgear unit (BMZ switchgear) was installed, meeting high standards of reliability and industrial safety.

As a result of the modernization, the stability and efficiency of the power system were enhanced, providing reliable electricity supply to thousands of consumers and creating a strong foundation for the further development of the region’s infrastructure.

Modernization of electrical networks in a residential district

Flux implemented a comprehensive project for the modernization and reconstruction of electrical networks in the Nursaya residential district. The project involved replacing 66 km of ACB cables with modern self-supporting insulated wires (SIW), which significantly improved the reliability and safety of the power supply.

Additionally, a new distribution point was constructed, and a modular enclosed switchgear unit (BMZ switchgear) was installed, meeting the highest standards of reliability and industrial safety.

As a result, the modernization enhanced the stability and efficiency of the power system, ensured a reliable electricity supply for thousands of consumers, and created a strong foundation for the further development of regional infrastructure.

Interested in partnership?

Let us know what you’re interested in, and we’ll get back to you shortly.